LRT Jabodebek Operates 12 Trainsets to Shorten Waiting Time

Uji coba terbatas LRT Jabodebek.
Sumber :
  • VIVA/M Ali Wafa

As information, the addition of this trainset has a significant impact on the waiting time for one train to the next (headway), both during peak hours and outside peak hours as follows: 

Rush Hour Headway ( 5 p.m - 10 p.m. and 3 p.m. - 9 p.m.)

- Jatimulya/Harjamukti Station to Cawang: 30 minutes to 18.5 minutes

- Cawang to Dukuh Atas Station: 15 minutes to 9.3 minutes

Waiting Time Outside Rush Hour (10 p.m. - 3 p.m.): 

- Jatimulya/Harjamukti Station to Cawang: 60 minutes to 37 minutes

- Cawang to Dukuh Atas Station: 30 minutes to 18.5 minutes